November 14th - November 18th

posted Nov 15, 2016, 6:29 AM by Mr Becker


WE are building set pieces for the Theater Department.

We will be building at least 4 set
 1) Bake Shop
 2) Fireplace Room
 3) Window Room
 4) Rapunzel Tower

All set pieces will be built on 4 by 8 ft flats and your design needs to fit in that parameter


We are going to treat this project as an actual job:  Your team will be pitching their designs against each other.


Your need to draw and correctly proportion each set piece.
You need to research materials (wood, fasteners) to use, and have precise quantities
You need to figure out labor, time and expenses.

We will decide on the best design and budget as a class and submit it to the Theater Dept. for their approval BY THANKSGIVING BREAK

Once approved, we will move forward with a construction plan